Room Renovations

Under the direction of the Provost’s Office, the Teaching & Learning Commons works directly with WVU’s Facilities and Services units to provide consultation and direction for the construction and renovation of instructional technology classrooms. Over the past several years, many newly created or renovated instructional facilities have been designated as TLC-supported rooms.

See also: WVU facilities master update feature 16 projects under active construction (2018 WVUToday article).

Listed below are TLC’s most recent technology classroom renovations, as well as some expected in the near future.

 

SUMMER 2006: Building: Room: Type: Extras:
1 ALH 406 Standard Dual Screen
2 ALH 510 Standard  
3 ALH 511 Standard  
4 ALH 610 Standard  
5 ALH 611 Standard  
6 ARM 206 Standard Dual Screen
7 ARM 219 Standard Tri-Screen
8 ESB G39 Standard  
9 ESB G84 Standard  
10 ESB 207 Standard  
11 MRB 113 Standard  

 

SUMMER 2007: Building: Room: Type: Extras:
1 ARM 306 Standard  
2 BUE 458 Standard  
3 CHI G1 Standard  
4 CHI G5 Standard  
5 CKH 104 Standard  
6 CKH 112 Standard  
7 CKH 208 Standard  
8 CKH 312 Standard  
9 EIE 503 Standard  
10 BKH G25 Standard Dual Screen
11 BKH 125 Standard Dual Screen
12 BKH 151 Standard Dual Screen
13 BKH 202 Standard Dual Screen
14 BKH 225 Standard Dual Screen
15 BKH 302 Standard  
16 MHH G20 Standard Dual Screen
17 MHH G21 Standard Dual Screen
18 MHH 122 Standard Dual Screen
19 MHH 126 Standard Dual Screen
20 OGH G2b Standard  
21 OGH G10 Standard Dual Screen
22 OGH 102 Standard
23 OGH 103 Standard
24 OGH 106 Standard
25 OGH 107 Standard
26 OGH 110 Standard
27 OGH 117 Standard Dual Screen
28 OGH 118 Standard Dual Screen

 

SUMMER 2008: Building: Room: Type: Extras:
1 AGS 1001 Standard
2 ALH 612 Basic  
3 ALH 703 Basic  
4 ALH 711 Basic  
5 ALH 712 Basic  
6 ALH 808 Basic  
7 ALH 809 Basic  
8 BUE 459 Standard
9 ESB G102 Standard Dual Screen
10 PER 332 Standard
11 WDB G4 Standard
12 WDB G21 Standard
13 WDB 101 Standard
14 WDB 102 Standard
15 WDB 105 Standard
16 WDB 106 Standard
17 WDB 109 Standard
18 WDB 110 Standard
19 WDB 116 Standard Dual Screen

 

SUMMER 2009: Building: Room: Type: Extras:
1 PER 314a Standard
2 PER 315 Computer Lab

3 PER 316 Standard Dual Screen
4 STA 46c Standard
5 STA 47 Standard
6 STA 48 Standard
7 WDB G10 Standard
8 WDB G16 Standard
9 WDB G20 Basic

 

SUMMER 2010: Building: Room: Type: Extras:
1 AGS G29 Standard
2 AGS G31 Standard
3 AGS G101 Standard
4 AGS 1036 Basic
5 AGS 1085 Standard
6 AGS 2001 Standard
7 AGS 2055 Standard
8 AGS 2061 Standard
9 CKH 317 Standard
10 CKH 320 Standard
11 LSB G11 Standard Mac
12 LSB G15 Standard Mac, Dual Screen
13 LSB G21 Standard Mac
14 LSB G23 Standard Mac
15 Towers, Bennett
G05 Standard Dual Screen
16 Towers, Lyon
G06 Computer Lab

17 Towers, Lyon
G07 Standard
18 Towers, Lyon
G08 Collaborative Two Smartboards
19 WDB G11 Standard
20 WDB G15 Standard

 

SUMMER 2011: Building: Room: Type: Extras:
1 CKH 200 Standard
2 EIE G24 Standard
Dual Screen
3 EIE G26 Standard
4 EIE G27 Standard
5 PER 334 Standard Dual Screen

 

WINTER 2011: Building: Room: Type: Extras:
1 WHI B51 Standard Dual Screen
2 WHI G4 Standard
3 WHI G6 Standard
4 WHI G9 Standard Tri-Screen

 

SUMMER 2012: Building: Room: Type: Extras:
1 CKH 101 Digital Standard Dual Screen

 

SUMMER 2013: Building: Room: Type: Extras:
1 ALH 711 Digital Standard
2 ALH
712
Digital Standard
3 ALH
808
Digital Standard
4
ARM 209
Digital Standard
5
BUE 244
Digital Collaborative Multiple Smartboards

 

SUMMER 2014: Building: Room: Type: Extras:
1
ALH 612
Digital Standard
2
ALH 703
Digital Standard
3
ALH 809
Digital Standard
4
ARM 119
Digital Standard
5
EVL G16
Digital Computer Lab
6
PER 335
Digital Collaborative Multiple Input-Panel Stations
7
PAS (now AHB) G6
Digital Standard Dual Screen
8
PAS (now AHB) G8 Digital Standard Dual Screen
9
PAS (now AHB) G10 Digital Standard
10 PAS (now AHB) 101
Digital Standard
11 PAS (now AHB) 102
Digital Standard
12
PAS (now AHB) 103
Digital Standard
13
PAS (now AHB) 104
Digital Standard
14
PA (now AHB) 115
Digital Collaborative Dual Screen
15
PAS (now AHB) 116
Digital Standard
16 NRCCE 101 Digital Standard Dual Screen
17 NRCCE 125 Digital Standard
18 NRCCE 127 Digital Standard

 

SPRING 2015: Building: Room: Type: Extras:
1 ART G7 Digital Standard
2 AERB 135 Digital Standard

 

SUMMER 2015: Building: Room:
Type: Extras:
1 HOD 250 Digital Standard
2 HOD 252
Digital Standard
3 ESB G83
Digital Standard
4 ARM 112 Plug-N-Play
5 ARM 117 Plug-N-Play
6 ARM 120 Plug-N-Play
7 ARM 121 Plug-N-Play
8 ARM 123 Plug-N-Play
9 ARM 203 Plug-N-Play
10 ARM 207 Plug-N-Play
11 ARM 403 Plug-N-Play
12 ARM 407 Plug-N-Play
13 ARM 415 Plug-N-Play

 

WINTER 2015: Building: Room:
Type: Extras:
1 EVC 412 Digital Standard
2 EVC 414 Digital Standard Dual Screen

 

SUMMER 2016: Building: Room:
Type: Extras:
1 BUE 458 Digital Standard
2 BUE 459 Digital Standard
3 ESB G78A Digital Standard
4 ESB 501 Digital Standard
5 New AgSci G6 Digital Standard Dual Screen
6 New AgSci 1007 Digital Standard
7 New AgSci 1010 Digital Standard
8 New AgSci 2003 Digital Standard
9 New AgSci 2004 Digital Standard Dual Screen
10 New AgSci 2010 Digital Standard
11 SAS 1021 Digital Standard Dual Screen

 

FALL 2016: Building: Room:
Type: Extras:
1 HOD 216 Plug-N-Play
2 HOD 309 Plug-N-Play
3 HOD 310 Plug-N-Play

 

WINTER 2016: Building: Room:
Type: Extras:
1 CHI 101 Plug-N-Play
2 CHI 102 Plug-N-Play

 

SPRING 2017: Building: Room:
Type: Extras:
1 CHI G17 Plug-N-Play
2 CKH 111 Plug-N-Play
3 HOD 201 Plug-N-Play

 

SUMMER 2017: Building: Room(s): Type: Extras:
1 ARM 306 Digital Computer Lab
2 ARM 315 Digital Standard
3 ARM 422
Digital Standard
4 CKH 206
Plug-N-Play
5 CKH 212 Plug-N-Play
6 HOD 202
Plug-N-Play
7 HOD 215
Plug-N-Play
8 HOD 222
Plug-N-Play
9 HOD 223
Plug-N-Play
10 HOD 248
Plug-N-Play
11 HOD 301
Plug-N-Play
12 HOD 302
Plug-N-Play
13 HOD 316
Plug-N-Play
14 MRB 113
Digital Standard

 

SPRING 2018: Building: Room:
Type: Extras:
1 WHI G4 Standard Added WCR***

 

SUMMER 2018: Building: Room:
Type: Extras:
1 ESB G39 Digital Standard
2 EVC 412 Standard Added WCR***
3 MHH G20 Digital Standard
4 MHH G21 Digital Standard
5 MTL 114 (Gluck) Plug-N-Play
6 PER 335 Digital Collaborative Added WCR***
7 WHI G9 Digital Standard Triple-Screen

 

WINTER 2018: Building: Room:
Type: Extras:
1 OGH 107 Digital Standard

 

SUMMER 2019: Building: Room(s): Type: Extras:
1 ALH 406 Digital Standard Dual Screen
2 BKH 202 Digital Standard Dual Screen
3 CAC 2140 Digital Standard Dual Screen TVs
4 ESB G84 Digital Standard
5 PAS 115 Digital Standard Dual Screen

 

FALL 2019: Building: Room(s): Type: Extras:
1 BKH G25 Digital Standard Dual Screen
2 LSB G15 Digital Standard Dual Screen

 

WINTER 2019-20: Building: Room(s): Type: Extras:
1 MHH 122 Digital Standard Dual Screen
2 MHH 126
Digital Standard Dual Screen
3 OGH 102 Digital Standard
4 PER 316 Digital Standard Dual Screen

 

SUMMER 2020:
Building: Room(s): Type: Notes:
Covid-19 halted all planned classroom renovations. Webcam installs, audio reconfigurations, and computer upgrades implemented.
1 ALU Salon A, B, C (2 of 3) Temp Classroom Designed, Not Upgraded
2 ARH G22 Temp Classroom Dual Screen, Installed, Not Used
3 ARN 181 Temp Classroom Installed, Not Used
4 BRT G58 (Old Bookstore) Temp Classroom Designed, Not Upgraded
5 LYT M08 (Blue Room) Temp Classroom Designed. Upgraded & Used Spring 2021
6 LYT M14 (Jean Benson Lounge) Temp Classroom Designed, Not Upgraded
7 MET 100 Temp Classroom Designed, Not Installed
8 MTL 114 (Gluck) Digital Standard Upgraded
9 MTL 236 (Ballrooms) Temp Classroom Designed & Wired, Not Upgraded
10 NDL 104 Temp Classroom Designed, Not Upgraded
11 NDL 2036 Temp Classroom Designed, Not Upgraded
12 SRC G44 Temp Classroom Installed & Used
13 SRC 120 Temp Classroom Installed, Not Used
14 WES GYM Temp Classroom Designed, Not Used

 

SUMMER 2021:
(holdover from 2020)
Building: Room(s): Type: Extras:
1 ARM 206 Digital Computer Lab Dual Screen
2 ARM 219 Digital Computer Lab Triple Screen
3 CKH 104 Digital Standard
4 CKH 112 Digital Standard

 

SUMMER 2021: Building: Room(s): Type: Extras:
1 HOD 106 Digital Standard
2 HOD 112 Digital Standard
3 HOD 116 Digital Standard

4 HOD 133 Digital Standard

5 HOD 202 Digital Standard
Dual Screen
6 HOD 210 Digital Standard

7 HOD 214 Digital Standard

8 HOD 220 Digital Standard

9 HOD 221 Digital Collaborative
Multiple Input-Panel Stations
10 HOD 232 Digital Standard

11 HOD 301 Digital Standard

12 HOD 302 Digital Standard
Dual Screen
13 HOD 307 Digital Standard

14 HOD 308 Digital Standard

15 HOD 312 Digital Standard

16 HOD 315 Digital Standard

17 HOD 318 Digital Standard
18 HOD 321 Digital Standard

19 HOD 322 Digital Standard

20 HOD 336 Digital Standard

21 HOD 338 Digital Standard

22 HOD 340 Digital Standard

23 HOD 401 Digital Standard

24 HOD 402 Digital Standard
Dual Screen

 

SPRING 2022: Building: Room(s): Type: Extras:
1 CKH 414 Plug-N-Play (taking place of CKH 111)

 

SUMMER 2022: Building: Room(s): Type: Extras:
0 REY x0 Digital Standard Consult Only; No CTec Rooms
1 ESB G102 Digital Standard Dual Screen

 

*WINTER 2023: Building: Room(s): Type: Extras:
1 CHI G1 Digital Standard
2 CHI G5 Digital Standard

3 CHI 101 Digital Standard

4 CHI 102 Digital Standard

 

*Future: Building: Room(s): Type: Extras / Notes:
1 (on hold) Field Hall (old BUE) 1211 (fmr 128) Digital Standard
2 (on hold) Field Hall (old BUE)
2202 (fmr 244) Digital Standard

3 (on hold) Field Hall (old BUE)
2208 (fmr 230) Digital Standard w/TV
(Departmental, not GPC)
4 -Priority GPC since funding issues Field Hall (old BUE)
3201 (fmr 348 & 349) Digital Standard
Dual Screen
5 Field Hall (old BUE)
4001 (fmr 458) Reuse Existing Equip.

6 Field Hall (old BUE)
4002 (fmr 459) Reuse Existing Equip.
7 (on hold) Field Hall (old BUE)
4201 (fmr 441) Digital Standard

8 (on hold) Field Hall (old BUE)
4202 (fmr 440) Digital Standard

9 -Priority dept room Field Hall (old BUE)
4208 (fmr 428) Digital Standard w/ TV
(Departmental, not GPC)

 

*Note: Future listings are only provided as potential options. Actual classroom renovations may change without notice. Modifications in available budget, progression of planning/design/construction, and re-prioritizing by WVU Administration can affect these lists at any time.

**This facility was later turned over to another unit to provide support.

***WCR is Web-Conference-Ready space.